| Lead flashing on roof finshed The lead flashing was put on the roof today and the final line of slates stuck down. It was so cold that a blow torch was needed just to make the lead malleable. 10 slates have been blown off since the slating was completed, the ones that were found were used once more. The completed ridge line should stop them blowing off again. 04 January 2008 |