The dwangs for attaching the plasterboard are now all in upstairs in walls roof and combs. There are 17 dwangs for each bay so it took a while. 17 November 2007
upper floor
Upper floor in
The 22mm chipboard span flooring is now in on the top floor. Its mainly dry unless it gets windy. 03 November 2007