Kingspan 100mm, glass wool and plaster board all arrive on a dry day and are shipped indoors, ready for upstairs. 20 December 2007
Wind and watertight soiree
Wind and watertight party
A year on from moving to the caravan and we have a wind and watertight party, with chilli and soup and indoor football. Later there was dancing. Next time we'll wait till the insulation is in.
15 December 2007
Ground floor first fit electrics
First fit electrics
The roughing out of the electric cabling in the ceilings and wall spaces is no complete. Dwangs are in place to support the sockets and switches 12 December 2007
Windows in!
Exactly a year since the caravan arrived on site and the house is wind and watertight. The windows and doors were all put in in a day and are very heavy. The glass is all impact resistant low-E. 01 December 2007