Skye Baby - unique clothing for children babies and adults, hand dyed on the Isle of Skye, Scotland
Powered by sitekit. It's good on the croft...
 

 archive

Breabost archive from April 2008
Copper heaven Click for full size imagePlumbing nirvana

The copper piping for the heating system is now alomst complete. Its fairly complex with multiple connections across 4 different pipe diameters sizes. In total 18m of copper tubing has been used and over 50 elbows , T's and compression fittings.
20 April 2008


plaster downstairs Click for full size imageFirst plaster downstairs

We're now doing the first coat of fast set plaster downstairs. You can see the ceiling and wall joints on the picture below. you can also see the small area that the heat pump plumbing is having to fit into.
17 April 2008


plumbing schematic Click for full size imagePlumbing schematic

For the deeply troubled amongst you the heat pump plumbing schematic for our house is available for download here.
13 April 2008


utility room Click for full size imageFinal walls completed

The last of the stud walls went in so all the rooms are now complete. The last to be done was the utility room and downstairs bathroom. 
12 April 2008


Heat pump top Click for full size imagePlumbing in the heat pump

Started to plumb in the heat pump. Picture shows detail from top of pump. With the mains water connection. A thing of beauty.
07 April 2008


Heat pump Click for full size imageHeat pump plumbing starts

A large mass of copper and brass bit has now been gathered together all that remain is their assembly. 1 heat pump, 1 buffer tank, 2 expansion tanks, 2 pumps, 1 levelling vessel, 3 tundishes, 8 valves.
06 April 2008


painting Click for full size imageFirst Painting done

We painted the smallest room to see what it looked like after our plastering. Not bad but next time we'll sand in bright light.
03 April 2008