Then steel reinforcing mesh is added to stop it blowing away. Then it rains
30 June 2007
Next layer
Next its the DPC and 10cm of insulation. Is that rain on the horizon? 30 June 2007
Tea break
30 June 2007
Further flattening
The interior floor is further flattened and leveled with crusher dust and a viabration plate. Thats uncle Norman on the job 30 June 2007
Flattening the floor
The interior is first leveled using the exisiting pan and then flattened via a vibration plate. The soil pipe, waste fittings and rodding points have already been buries and drilled through the walls. 29 June 2007
Block work footings complete
Feline inspection of single thickness block work footings. This is the interior wall 22 June 2007
Sand delivery
This is the sand getting delivered for the block work. Nightmare midgie night. 20 June 2007
Blocks delivery
The survey posts are in and the block levels are set. Blocks have also been delivered. 20 June 2007
Foundation readymix
The founds are poured from ready mix and flattened out manually 11 June 2007
Trenching in
08 June 2007
Initial inspection
07 June 2007
Foundations!
Johnnie Skipper starts to dig the neatest trench on Skye 07 June 2007