| Heat pump collector day 3 The final loops have gone in and the run back to the house., it was a long 300m. The trenches have all been back-filled, including the removal of some substantial boulders. The collector pipes have been routed trough the house wall, insulated and hooked into the heatpump. 06 June 2008 |