The scratch coat is now on one gable ready for the render. 28 August 2007
Gable end window
The block work is now up to the level of the gable end window 17 August 2007
Lintels on door and smaller windows
The concrete lintels have now been added to all of the smaller doors and windows. Torrential rain last night again. 15 August 2007
Roofing felt in place and battened down
The roof has now been felted and is wating for the slates. If it wasn't for the veluxes it would be dry inside. Swallow are roosting in the rafters. No block work today, 20mm of rain overnight. 11 August 2007
Block work going up
The block work is now copmpleted to head height and the house successfully stayed up during a bad summer gale. 05 August 2007